On average, an experienced fitter requires about 30 minutes to produce a hinge.
But in a factory in Shanghai's Qingpu Industrial Park, the production of a hinge takes just a fraction of that time - one minute.
Here, 13 automated assembly lines operate around the clock as a team of 22 engineers...